Progress in the ITER neutral beam test facility

Articolo
Data di Pubblicazione:
2019
Abstract:
Heating neutral beam (HNB) injectors, necessary to achieve burning conditions and to control plasma instabilities in ITER, are characterized by such demanding parameters that a neutral beam test facility (NBTF) dedicated to their development and optimization is being realized in Padua (Italy) with direct contributions from the Italian government (through Consorzio RFX as the host entity) and the ITER international organization (with kind contributions from the ITER domestic agencies of Europe, Japan and India) and technical and scientific support from various European laboratories and universities. The NBTF hosts two experiments: SPIDER, devoted to ion source optimization for the required source performance, and MITICA, the full-size prototype of the ITER HNB, with an ion source identical to SPIDER. This paper gives an overview of the progress towards NBTF realization, with particular emphasis on issues discovered during this phase of activity and on solutions adopted to minimize the impact on the schedule and maintain the goals of the facilities. The realization of MITICA is well advanced; operation is expected to start in 2023 due to the long procurement time of the in-vessel mechanical components. The beam source power supplies, operating at 1 MV, are in an advanced phase of realization; all high-voltage components have been installed and the complex insulation test phase began in 2018. At the same time, construction and installation of SPIDER plant systems was successfully completed with their integration into the facility. The mechanical components of the SPIDER ion source were installed inside the vessel and connected to the plants. Integrated commissioning with the control, protection and safety systems ended positively and the first experimental phase has begun. The first results of the SPIDER experiment, with data from operational diagnostics, and the plans for the 1 MV insulation tests on the MITICA high-voltage components are presented.
Tipologia CRIS:
01.01 Articolo in rivista
Keywords:
ITER; neutral beam injector; PRIMA: the ITER neutral beam test facility (NBTF); SPIDER
Elenco autori:
Recchia, Mauro; Pomaro, Nicola; Antoni, Vanni; DE LORENZI, Antonio; Taliercio, Cesare; Sottocornola, Aldo; Serianni, Gianluigi; Grando, Luca; Spolaore, Monica; Agostinetti, Piero; Agostini, Matteo; Brombin, Matteo; DALLA PALMA, Mauro; Luchetta, ADRIANO FRANCESCO; Piovan, Roberto; Rebai, Marica; Muraro, Andrea; Toigo, Vanni; Zaccaria, Pierluigi; Tardocchi, Marco; Gaio, Elena; Marchiori, Giuseppe; Manduchi, Gabriele; Pasqualotto, Roberto
Autori di Ateneo:
AGOSTINETTI PIERO
AGOSTINI MATTEO
BROMBIN MATTEO
DALLA PALMA MAURO
GRANDO LUCA
LUCHETTA ADRIANO FRANCESCO
MANDUCHI GABRIELE
MARCHIORI GIUSEPPE
MURARO ANDREA
PASQUALOTTO ROBERTO
POMARO NICOLA
REBAI MARICA
RECCHIA MAURO
SERIANNI GIANLUIGI
SOTTOCORNOLA ALDO
SPOLAORE MONICA
TALIERCIO CESARE
TARDOCCHI MARCO
Link alla scheda completa:
https://iris.cnr.it/handle/20.500.14243/388877
Pubblicato in:
NUCLEAR FUSION
Journal
  • Dati Generali

Dati Generali

URL

https://iopscience.iop.org/article/10.1088/1741-4326/ab2271/meta
  • Utilizzo dei cookie

Realizzato con VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)