Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze
  1. Pubblicazioni

Progress of the ITER NBI acceleration grid power supply reference design

Articolo
Data di Pubblicazione:
2013
Abstract:
This paper reports the progress in the reference design of the Acceleration Grid Power Supply (AGPS) of the ITER Neutral Beam Injector (NBI). The design of the AGPS is very challenging, as it shall be rated to provide about 55 MW at 1 MV dc in quasi steady-state conditions; moreover, the procurement of the system is shared between the European Domestic Agency (F4E) and the Japanese Domestic Agency (JADA), resulting in additional design complication due to the need of a common definition of the interface parameters. A critical revision of the main design choices is presented also in light of the definition of some key interface parameters between the two AGPS subsystems. Moreover, the verification of the fulfillment of the requirements in any operational conditions taking into account the tolerance of the different parameters is also reported and discussed.
Tipologia CRIS:
01.01 Articolo in rivista
Keywords:
ITER; NBI; Power Supply
Elenco autori:
Toigo, Vanni; Gaio, Elena
Link alla scheda completa:
https://iris.cnr.it/handle/20.500.14243/178811
Pubblicato in:
FUSION ENGINEERING AND DESIGN
Journal
  • Dati Generali

Dati Generali

URL

http://www.sciencedirect.com/science/article/pii/S0920379613000148
  • Utilizzo dei cookie

Realizzato con VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)