Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze
  1. Pubblicazioni

The timing system of the ITER full size neutral beam injector prototype

Articolo
Data di Pubblicazione:
2019
Abstract:
The ITER Neutral Beam Test Facility (NBTF) is currently under construction at Consorzio RFX, Padova, Italy. The NBTF includes two experimental devices: SPIDER for the study of the ion source and MITICA for the development of the full-size HNB prototype. Even if the two experiments share many architectural aspects in their Control and Data Acquisition System (CODAS), there are nevertheless some significant differences because MITICA must adhere to ITER's directives for plant control design. This paper describes the architecture of the MITICA timing system that represents one of the first examples of integration of IEEE1588 timing functions in fusion research medium-scale experiments.
Tipologia CRIS:
01.01 Articolo in rivista
Keywords:
Timing systems; Data acquisition; IEEE1588; MDSplus
Elenco autori:
Taliercio, Cesare; Luchetta, ADRIANO FRANCESCO; Manduchi, Gabriele
Autori di Ateneo:
LUCHETTA ADRIANO FRANCESCO
MANDUCHI GABRIELE
TALIERCIO CESARE
Link alla scheda completa:
https://iris.cnr.it/handle/20.500.14243/389588
Pubblicato in:
FUSION ENGINEERING AND DESIGN
Journal
  • Dati Generali

Dati Generali

URL

https://www.sciencedirect.com/science/article/pii/S0920379618308111
  • Utilizzo dei cookie

Realizzato con VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)