Data di Pubblicazione:
2014
Abstract:
We study an operation scheduling problem where a finite
set of jobs with due dates must be completed by one
machine: each job is completed as soon as a specific
subset of unit operations is done. Distinct jobs may
share operations, and when an operation is done, it is
done for all the jobs that share it. The goal is to sched-
ule operations so that the (weighted) number of tardy
jobs is minimized. We reformulate the problem as max-
imum stable set problem on a special graph and study
its structure. Valid inequalities and optimality cuts are
derived, separated, and tested in a computational experi-
ence that identifies some features of hard instances and
the potential contribution of the addition, at root, of vari-
ous cut classes.
Tipologia CRIS:
01.01 Articolo in rivista
Keywords:
linear arrangement; scheduling; stable set problem; integer linear programming
Elenco autori:
Felici, Giovanni
Link alla scheda completa:
Pubblicato in: