Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze
  1. Pubblicazioni

Maintenance Schemes for the ITER Neutral Beam Test Facility

Articolo
Data di Pubblicazione:
2005
Abstract:
The ITER neutral beam test facility (NBTF) is planned to be built, after the approval of the ITER construction and the choice of the ITER site, with the agreement of the ITER international team and of the JA and RF participant teams. The key purpose is to progressively increase the performance of the first ITER injector and to demonstrate its reliability at the maximum operation parameters: power delivered to the plasma 16.5MW, beam energy 1MeV, accelerated D- ion current 40 A, pulse length 3600 s. Several interventions for possible modifications and for maintenance are expected during the early operation of the ITER injector in order to optimise the beam generation, aiming and steering. The maintenance scheme and the related design solutions are therefore a very important aspect to be considered for the NBTF design. The paper describes consistently the many interrelated aspects of the design, such as the optimisation of the vessel and cryopump geometry, in order to get a better maintenance flexibility, an easier man access and a larger access for diagnostic and monitoring.
Tipologia CRIS:
01.01 Articolo in rivista
Keywords:
Neutral beam injector; Maintenance; Access; Cryopump; Vessel
Elenco autori:
Antoni, Vanni; Zaccaria, Pierluigi
Link alla scheda completa:
https://iris.cnr.it/handle/20.500.14243/42415
Pubblicato in:
FUSION ENGINEERING AND DESIGN
Journal
  • Dati Generali

Dati Generali

URL

http://www.sciencedirect.com/science/article/pii/S092037960500089X
  • Utilizzo dei cookie

Realizzato con VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)