Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze
  1. Pubblicazioni

Generalized extremal optimization of predictive maintenance to enhance monitoring of large experimental systems

Contributo in Atti di convegno
Data di Pubblicazione:
2014
Abstract:
Predictive maintenance scheduling is an optimization problem aimed at defining the best activity sequence to minimize the expected cost over a time horizon. For very-large systems such as in experimental physics, maintenance optimization turns out to be very difficult owing to analytically intractable objective functions. In this paper, a meta-heuristic predictive maintenance algorithm based on the Generalized Extremal Optimization (GEO) is presented. With respect to state-of-the-art meta-heuristic techniques, the GEObased maintenance algorithm allows optimization procedure to be configured easily through only one parameter without a numerous population. Preliminary results of the algorithm performance validation on the liquid helium storage system of the Large Hadron Collider at CERN are reported.
Tipologia CRIS:
04.01 Contributo in Atti di convegno
Keywords:
Generalized extremal optimization; predictive maintenance; large experimental system monitoring
Elenco autori:
Maisto, Domenico
Autori di Ateneo:
MAISTO DOMENICO
Link alla scheda completa:
https://iris.cnr.it/handle/20.500.14243/271566
  • Dati Generali

Dati Generali

URL

http://www.scopus.com/inward/record.url?eid=2-s2.0-84918840730&partnerID=q2rCbXpz
  • Utilizzo dei cookie

Realizzato con VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)