An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations

Articolo
Data di Pubblicazione:
2017
Abstract:
This paper addresses the resource-constrained project scheduling problem with uncertain activity durations. An adaptive robust optimization model is proposed to derive the resource allocation decisions that minimize the worst-case makespan, under general polyhedral uncertainty sets. The properties of the model are analyzed, assuming that the activity durations are subject to interval uncertainty where the level of robustness is controlled by a protection factor related to the risk aversion of the decision maker. A general decomposition approach is proposed to solve the robust counterpart of the resource-constrained project scheduling problem, further tailored to address the uncertainty set with the protection factor. An extensive computational study is presented on benchmark instances adapted from the PSPLIB.
Tipologia CRIS:
01.01 Articolo in rivista
Keywords:
Benders decomposition; Project scheduling; Resource constraints; Robust optimization
Elenco autori:
DI PUGLIA PUGLIESE, Luigi
Autori di Ateneo:
DI PUGLIA PUGLIESE LUIGI
Link alla scheda completa:
https://iris.cnr.it/handle/20.500.14243/385456
Pubblicato in:
OMEGA
Journal
  • Dati Generali

Dati Generali

URL

http://www.scopus.com/record/display.url?eid=2-s2.0-85002410341&origin=inward
  • Utilizzo dei cookie

Realizzato con VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)