Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills
  1. Outputs

Decision support methodology to establish priorities on the inspection of structures

Abstract
Publication Date:
2014
abstract:
For hydro-meteorological hazards in mountain areas, the regular inspection of check dams and bridges is important due to the effect of their functional status on water-sediment processes. Moreover, the inspection of these structures is time consuming for organizations due to their extensive number in many regions. However, trained citizen-volunteers can support civil protection and technical services in the frequency, timeliness and coverage of monitoring the functional status of hydraulic structures. Technicians should evaluate and validate these reports to get an index for the status of the structure. Thus, preventive actions could initiate such as the cleaning of obstructions or to pre-screen potential problems for a second level inspection. This study proposes a decision support methodology that technicians can use to assess an index for three parameters representing the functional status of the structure: a) condition of the structure at the opening of the stream flow, b) level of obstruction at the structure and c) the level of erosion in the stream bank. The calculation of the index for each parameter is based upon fuzzy logic theory to handle ranges in precision of the reports and to convert the linguistic rating scales into numbers representing the structure's status. A weighting method and multi-criteria method (Analytic Hierarchy Process- AHP and TOPSIS), can be used by technicians to combine the different ratings according to the component elements of the structure and the completeness of the reports. Finally, technicians can set decision rules based on the worst rating and a threshold for the functional indexes. The methodology was implemented as a prototype web-based tool to be tested with technicians of the Civil Protection in the Fella basin, Northern Italy. Results at this stage comprise the design and implementation of the web-based tool with GIS interaction to evaluate available reports and to set priorities on the inspection of structures.
Iris type:
04.02 Abstract in Atti di convegno
Keywords:
Decision-making; Multi-criteria methods; Torrent control structures; Web-based tools
List of contributors:
CORTES AREVALO, VIVIAN JULIETTE; Sterlacchini, Simone; Schenato, Luca; Frigerio, Simone; Pasuto, Alessandro; Guzzetti, Fausto
Authors of the University:
PASUTO ALESSANDRO
SCHENATO LUCA
STERLACCHINI SIMONE
Handle:
https://iris.cnr.it/handle/20.500.14243/257134
Published in:
GEOPHYSICAL RESEARCH ABSTRACTS (ONLINE)
Journal
  • Overview

Overview

URL

http://meetingorganizer.copernicus.org/EGU2014/EGU2014-4189-3.pdf
  • Use of cookies

Powered by VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)