Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • Persone
  • Pubblicazioni
  • Strutture
  • Competenze
  1. Pubblicazioni

Technical challenges in the construction of the steady-state stellarator Wendelstein 7-X

Articolo
Data di Pubblicazione:
2013
Abstract:
The next step in the Wendelstein stellarator line is the large superconducting device Wendelstein 7-X, currently under construction in Greifswald, Germany. Steady-state operation is an intrinsic feature of stellarators, and one key element of the Wendelstein 7-X mission is to demonstrate steady-state operation under plasma conditions relevant for a fusion power plant. Steady-state operation of a fusion device, on the one hand, requires the implementation of special technologies, giving rise to technical challenges during the design, fabrication and assembly of such a device. On the other hand, also the physics development of steady-state operation at high plasma performance poses a challenge and careful preparation. The electron cyclotron resonance heating system, diagnostics, experiment control and data acquisition are prepared for plasma operation lasting 30 min. This requires many new technological approaches for plasma heating and diagnostics as well as new concepts for experiment control and data acquisition.
Tipologia CRIS:
01.01 Articolo in rivista
Keywords:
MAGNET SYSTEM; LIMIT ANALYSIS; W7-X; PHYSICS; PLASMA
Elenco autori:
Zuin, Matteo
Autori di Ateneo:
ZUIN MATTEO
Link alla scheda completa:
https://iris.cnr.it/handle/20.500.14243/252545
Pubblicato in:
NUCLEAR FUSION
Journal
  • Dati Generali

Dati Generali

URL

http://iopscience.iop.org/0029-5515/53/12/126001/pdf/0029-5515_53_12_126001.pdf
  • Utilizzo dei cookie

Realizzato con VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)