Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills
  1. Outputs

Status of the 1 MeV accelerator design for ITER NBI

Conference Paper
Publication Date:
2011
abstract:
The beam source of neutral beam heating/current drive system for ITER is needed to accelerate the negative ion beam of 40A with D- at 1MeV for 3600 sec. In order to realize the beam source, design and R&D works are being developed in many institutions under the coordination of ITER organization. The development of the key issues of the ion source including source plasma uniformity, suppression of co-extracted electron in D beam operation and also after the long beam duration time of over a few 100 sec, is progressed mainly in IPP with the facilities of BATMAN, MANITU and RADI. In the near future, ELISE, that will be tested the half size of the ITER ion source, will start the operation in 2011, and then SPIDER, which demonstrates negative ion production and extraction with the same size and same structure as the ITER ion source, will start the operation in 2014 as part of the NBTF. The development of the accelerator is progressed mainly in JAEA with the MeV test facility, and also the computer simulation of beam optics also developed in JAEA, CEA and RFX. The full ITER heating and current drive beam performance will be demonstrated in MITICA, which will start operation in 2016 as part of the NBTF.
Iris type:
04.01 Contributo in Atti di convegno
Keywords:
Accelerator; Beam source; Ion source; ITER; MITICA
List of contributors:
Pomaro, Nicola; Serianni, Gianluigi; Luchetta, ADRIANO FRANCESCO; Toigo, Vanni; Zaccaria, Pierluigi; Pasqualotto, Roberto
Authors of the University:
LUCHETTA ADRIANO FRANCESCO
PASQUALOTTO ROBERTO
POMARO NICOLA
SERIANNI GIANLUIGI
Handle:
https://iris.cnr.it/handle/20.500.14243/229147
  • Overview

Overview

URL

http://scitation.aip.org/content/aip/proceeding/aipcp/10.1063/1.3637426
  • Use of cookies

Powered by VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)