Publication Date:
2018
abstract:
The alternating current optimal power flow problem is a fundamental problem in the management of smart grids. In this paper we consider a variant which includes activation/deactivation of generators at some of the grid sites. We formulate the problem as a mathematical program, prove its NP-hardness w.r.t. activation/deactivation, and derive two perspective reformulations.
Iris type:
04.01 Contributo in Atti di convegno
Keywords:
optimal power flow; alternating current; mathematical programming
List of contributors: