Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills
  1. Outputs

Results of the JET real-time disruption predictor in the ITER-like wall campaigns

Academic Article
Publication Date:
2013
abstract:
The impact of disruptions in JET became even more important with the replacement of the previous Carbon Fiber Composite (CFC) wall with a more fragile full metal ITER-like wall (ILW). The development of robust disruption mitigation systems is crucial for JET (and also for ITER). Moreover, a reliable real-time (RT) disruption predictor is a pre-requisite to any mitigation method. The Advance Predictor Of DISruptions (APODIS) has been installed in the JET Real-Time Data Network (RTDN) for the RT recognition of disruptions. The predictor operates with the new ILW but it has been trained only with discharges belonging to campaigns with the CFC wall. 7 real-time signals are used to characterize the plasma status (disruptive or non-disruptive) at regular intervals of 32 ms. After the first 3 JET ILW campaigns (991 discharges), the success rate of the predictor is 98.36% (alarms are triggered in average 426 ms before the disruptions). The false alarm and missed alarm rates are 0.92% and 1.64%.
Iris type:
01.01 Articolo in rivista
Keywords:
APODIS; Disruption prediction; ITER; ITER-like wall; JET
List of contributors:
Murari, Andrea
Authors of the University:
MURARI ANDREA
Handle:
https://iris.cnr.it/handle/20.500.14243/212007
Published in:
FUSION ENGINEERING AND DESIGN
Journal
  • Overview

Overview

URL

http://www.sciencedirect.com/science/article/pii/S0920379613002974
  • Use of cookies

Powered by VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)