Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills
  1. Outputs

Assessing the Resource Usage in Scheduling with Incompatibilities

Academic Article
Publication Date:
2003
abstract:
In the field of resource constrained scheduling, the papers in the literature are mainly focused on minimizing the maximum completion time of a set of tasks to be carried out, paying attention to respecting the maximum simultaneous availability of each resource type in the system. This work, instead, considers the issues of balancing the resource usage and minimizing the peak of the resources allocated each time in the schedule, while keeping the makespan low. To this aim we propose a local search algorithm which acts as a multi start greedy heuristic. Extensive experiments on various randomly generated test instances are provided. Furthermore, we present a comparison with lower bounds and known heuristics.
Iris type:
01.01 Articolo in rivista
Keywords:
Scheduling; Resource levelling; Mathematical models
List of contributors:
Caramia, Massimiliano
Handle:
https://iris.cnr.it/handle/20.500.14243/157781
  • Use of cookies

Powered by VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)