Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills
  1. Outputs

A multi-criteria job scheduling framework for large computing farms

Academic Article
Publication Date:
2013
abstract:
In this paper, we propose a new multi-criteria job scheduler for scheduling a continuous stream of batch jobs on large-scale computing farms. Our solution, called Convergent Scheduler, exploits a set of heuristics that drives the scheduler in taking decisions. Each heuristics manages a specific problem constraint, and contributes to compute a value that measures the degree of matching between a job and a machine. Scheduling choices are taken both to meet the Quality of Service requested by the submitted jobs and to optimize the usage of software and hardware resources. In order to validate the scheduler we propose, it has been compared versus two common job scheduling algorithms: Easy and Flexible backfilling. Convergent Scheduler demonstrated to be able to compute good assignments that allow a better exploitation of resources with respect to the other algorithms. Moreover, it has a simple modular structure that makes simple its extension and customization to meet the service goal of an installation.
Iris type:
01.01 Articolo in rivista
Keywords:
Multi-objective optimization; Job scheduling; Heterogeneous computing farm; Utility computing; Performance evaluation
List of contributors:
Capannini, Gabriele; Baraglia, Ranieri; Dazzi, Patrizio
Handle:
https://iris.cnr.it/handle/20.500.14243/289099
Published in:
JOURNAL OF COMPUTER AND SYSTEM SCIENCES
Journal
  • Overview

Overview

URL

http://www.sciencedirect.com/science/article/pii/S0022000012001006
  • Use of cookies

Powered by VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)