Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills
  1. Outputs

Final design of the High Voltage Deck 1 and Bushing for MITICA: The ITER Heating Neutral Beam Injector prototype

Academic Article
Publication Date:
2017
abstract:
The Ion Source of the ITER Heating Neutral Beam Injector (HNB) is polarized at -1MVdc to ground. A large-1MVdc air-insulated Faraday cage (12.5 m (L) x 8.4 m (W) x 9.6 m (H)), called High Voltage Deck 1 (HVD1), hosts the Ion Source and Extractor Power Supplies (ISEPS) and the associated HNB diagnostics; the HVD1 is interfaced with a SF6 insulated Transmission Line (connecting the main power supplies to the HNB) through a High Voltage (HV) Bushing Assembly (HVBA) carrying inside ISEPS power conductors and diagnostics. The HVD1 and HVBA are unique devices for size, electrostatic and mechanical features. This paper presents the main design choices adopted to comply with the challenging technical requirements and the supporting electrostatic, seismic and thermal analyses. Finally, next procurement steps and definition of special tests to verify the key design choices are also reported.
Iris type:
01.01 Articolo in rivista
Keywords:
ITER; Heating Neutral Beam Injector (HNB); High voltage deck 1 (HVD1); High Voltage Bushing Assembly (HVBA); Insulation design; Seismic design; Thermal design
List of contributors:
Toigo, Vanni; Gaio, Elena
Handle:
https://iris.cnr.it/handle/20.500.14243/348853
Published in:
FUSION ENGINEERING AND DESIGN
Journal
  • Overview

Overview

URL

https://www.sciencedirect.com/science/article/pii/S0920379617303563
  • Use of cookies

Powered by VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)