The ITER neutral beam test facility: Designs of the general infrastructure, cryosystem and cooling plant
Academic Article
Publication Date:
2005
abstract:
European Research Centers and Associations as ENEA, FZK, IPP, UKAEA and CEA are involved in the design of the
first ITER neutral beam (NB) injector and the ITER neutral beam test facility. A
total power of about 50MW will have to be removed in steady state on the neutral beam test facility (NBTF). The main purpose
of this task is to make progress with the detailed design of the first ITER NB injector and to start the conceptual design of the
ITER NBTF. The general infrastructure layout of a generic site for the NBTF includes the test facility itself equipped with a
dedicated beamline vessel and integration studies of associated auxiliaries such as cooling plant, cryoplant and forepumping system.
Iris type:
01.01 Articolo in rivista
Keywords:
ITER; Neutral beam; Facility; Infrastructure
List of contributors:
Antoni, Vanni; Zaccaria, Pierluigi