Publication Date:
2011
abstract:
In this paper, we address the quay crane scheduling problem in maritime container terminals, with some new features on the machine environment. We consider rail-mounted cranes and we assume that they are not allowed to span all over the vessel and that they can work only in predefined time windows. We furthermore take into account one-way constraints on the crane movements. We present a mixed integer mathematical model and a
heuristic algorithm to get feasible solutions to the problem. Finally, we report on some computational experience.
Iris type:
01.01 Articolo in rivista
Keywords:
container terminal; scheduling; quay crane; logistics; heuristics
List of contributors:
Sammarra, Marcello
Published in: