Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills
  1. Outputs

A tabu search heuristic for the quay crane scheduling problem

Academic Article
Publication Date:
2007
abstract:
This paper proposes a tabu search heuristic for the Quay Crane Scheduling Problem (QCSP), the problem of scheduling a fixed number of quay cranes in order to load and unload containers into and from a ship. The optimality criterion considered is the minimum completion time. Precedence and non-simultaneity constraints between tasks are taken into account. The former originate from the different kind of operations that each crane has to perform; the latter are needed in order to avoid interferences between the cranes. The QCSP is decomposed into a routing problem and a scheduling problem. The routing problem is solved by a tabu search heuristic, while a local search technique is used to generate the solution of the scheduling problem. This is done by minimizing the longest path length in a disjunctive graph. The effectiveness of our algorithm is assessed by comparing it to a branch-and-cut algorithm and to a Greedy Randomized Adaptive Search Procedure (GRASP).
Iris type:
01.01 Articolo in rivista
Keywords:
container terminal; crane scheduling; disjunctive graph; Tabu search
List of contributors:
Sammarra, Marcello
Authors of the University:
SAMMARRA MARCELLO
Handle:
https://iris.cnr.it/handle/20.500.14243/153214
Published in:
JOURNAL OF SCHEDULING
Journal
  • Use of cookies

Powered by VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)