Publication Date:
2009
abstract:
Consorzio RFX will host two experimental devices to
address the main issues of the ITER heating neutral beam
injectors: SPIDER (Source for the Production of Ions of
Deuterium Extracted from Rf plasma), an ion source at low
acceleration voltage (100 kV), and MITICA (Megavolt ITer
Injector and Concept Advancement), a neutral beam
injector at 1 MV. ICE (Insulation and Cooling Experiment)
is a test facility developed at Consorzio RFX to tackle
significant SPIDER and MITICA technological aspects
that require a preliminary study. The ICE control system is
mainly based on commercial off-the-shelf products. It is
composed of four local units: automation and monitoring,
supervision, data handling, and communication. The
automation and monitoring unit is based on Siemens PLC
technology. The supervision unit relies on the commercial
PVSS-II SCADA system that is widely used at CERN. The
data handling unit, the only part of the ICE control system
not based on industrial products, extends the functionalities
of MDSplus, a framework for the management of scientific
data. The communication unit comprehends the network
infrastructure and the timing system. The paper presents
the ICE control system, its local units and the main
performance and operational requirements.
Iris type:
04.03 Poster in Atti di convegno
Keywords:
ICE; Insulation and Cooling Experiment; ITER; NBI; Neutral Beam Injector
List of contributors: