Skip to Main Content (Press Enter)

Logo CNR
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills

UNI-FIND
Logo CNR

|

UNI-FIND

cnr.it
  • ×
  • Home
  • People
  • Outputs
  • Organizations
  • Expertise & Skills
  1. Outputs

Problems related to crew planning and scheduling in a railroad company

Abstract
Publication Date:
1976
abstract:
The aim of the paper is first of all to describe and formulate some mathematical programming problems, which arise in a railroad company, and which are at present unsolved, at least as it regards large-scale real situation. Problems of such a king are crew and manpower planning, optimal time-table determination. For the crew scheduling problem a new algorithm is proposed which is based on the upper bound linear assignment algorithm. The optimal time-table problem is formulated as an optimal vertex-packing on an undirected graph, with additional linear integer constraints; this integer linear program is structured, i. e., it has a block angular matrix of the constraining system. Computational experience has been made on a sample of real problems coming from the Italian railroad company.
Iris type:
04.02 Abstract in Atti di convegno
Keywords:
mathematical programming; railroad company; time-table
List of contributors:
Mercatanti, Mauro
Handle:
https://iris.cnr.it/handle/20.500.14243/379013
Full Text:
https://iris.cnr.it//retrieve/handle/20.500.14243/379013/54952/prod_433914-doc_155007.pdf
  • Use of cookies

Powered by VIVO | Designed by Cineca | 26.5.0.0 | Sorgente dati: PREPROD (Ribaltamento disabilitato)